TECHNIC ONE a produced two assembly lines for high load excavators (100 Tons) as well as medium load ones (60 Tons). Those lines allow to easlily and quickly fit the production to those various types of excavators. The lines are equipped with a pulling system, which means that it gives a rate to the production: they move forward step-by-step at a specified pace.

Working gateway with various embedded movements

excamin1

Lines have been controlled by AIB Vinçotte for loads exceeding 100 tons

exca2

Shifting on adapted shuttle

excamin3

Rotary tables that allow assembly zones in various directions

excamin4