Manufacturing of 4 bridge crane grabs Four bridge crane grabs were manufactured and installed in an electrolysis hall for zinc recovery
Palletizing robot Technic One Engineering, in collaboration with ATI from the Eiffage Group, is carrying out a robotics project for 4 production lines.
Shuttle for changing rolling mill cylinders TECHNIC ONE has engineered and manufactured a shuttle system for the replacement of rolling mill cylinders.